亚洲av高清一区三区三区,日韩精品人妻无码久久久,伊人网在线视频观看91,国产不卡的丝袜综合在线

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
久久精品女?的天堂AV| 国产精品亚洲精品日韩已方| 好猛好深好爽喷水无码视频| 亚洲色成人影院影音先锋| 18禁在线毛片| 久久 中文字幕 一区二区| 亚洲熟伦熟女专区| 人妻一区二区三区久99| 亚洲变态自拍丝袜第一页| 亚洲欧美日韩久久精品第一区| 热久久这里只有精品国产| 区二区三区在线观看视频| 日韩午夜伦伦电影理论片| 99热国产在线观看播放| 亚洲AV无码乱码国产品| 在线欧美亚洲xxxxx| 无码专区一va亚洲v专| 国产毛片久久久久久精品| 伊人国产精品久久久久久| 久久精品36亚洲色抽烟| 好大好爽456在线观看| 青娱乐精品盛宴| 非洲大鸡巴插入日本久久| 熟女少妇无尺码在线观看| 欧洲精品99毛片免费高清观看| 91国产精品福利在线观看| 精品爆乳一区二区三区无码av| 久久婷婷综?色丁香五月| 大鸡巴视频免费在线观看| 久热视频 这里只有精品| 欧精久久久久久久久动漫| 欧美精品久久久天堂一区| 亚洲成国产人片在线观看| 久久精品国产精品亚洲色婷婷| 亚洲欧美一区二区三区日本| 亚洲成aⅤ人片在线观看| 人妻熟妇乱又伦精品hd| 国产精品无码一区免费看| 无码精品视频一区二区三区| 在线观看不卡av中文字幕| 国产精品99久久精品爆乳|